Powering the AI revolution
Intelligence to control the interface between the world's two most valuable infrastructure networks: power grids and data centers
Emerald AI transforms energy-intensive data centers into AI-powered grid allies
The Emerald AI Conductor platform enables AI data centers to flexibly adjust their power consumption from the electricity grid on demand, orchestrating the computing loads of inference, training, and fine-tuning AI models across a network of data centers to bolster the power grid’s reliability while meeting strict compute performance standards.
Flexibility could unlock up to 100 GW, or more than a decade of U.S. AI data center growth and trillions in AI investment, without enormous investments in electric grids or power plants—advancing innovation and competitiveness, ensuring power affordability for communities across the country, and bolstering the reliability of the electric power system.
Results
-
NVIDIA: Results of Emerald AI Demo
NVIDIA profiles its portfolio company, Emerald AI, and announces the results of a joint demonstration in Phoenix, Arizona, with Emerald AI, Oracle Cloud Infrastructure, Salt River Project, and EPRI.
-
Announcement: Launch and Results
Emerald AI unveils the results of its first commercial demonstration of real-world AI power demand flexibility to relieve peak grid stress in Phoenix and announces $24.5M in seed funding.
-
Academic Article: Phoenix Results
Colangelo et al., 2025 details the technical methodology and results of the Phoenix demo (preprint posted to the arXiv for early academic dissemination; article currently under peer review).
Team
Institutional Investors
Select Individual Investors
Advisors
Board of Directors